A fatal train crash in the southern state of Oaxaca has caused the fatalities of at least 13 people, an incident sure to fuel critical opposition regarding the rapidity and management of the country's flagship infrastructure initiatives.
The disaster happened on the Interoceanic Train, a line built to join the Atlantic and Pacific across the slenderest section of the Isthmus of Tehuantepec. This initiative was designed to offer an competing rail corridor to the Panama Canal, aimed at driving commercial progress in the area.
“We are going to meticulously determine what caused this tragedy,” affirmed the head of state.
The president reported that, of the some 250 people on board, another 98 were wounded, with five of those in grave condition. The president added plans to travel to Oaxaca to speak with those involved.
Major Initiative of Former Government
The Interoceanic Train was a signature infrastructure project of the previous administration, whose term concluded the previous year. This project was closely associated with his administration's developmental goals for the southern region.
Another massive railway undertaking from that era, a passenger and freight circuit around the Yucatán Peninsula, was also part of the broader strategy to stimulate the economic fortunes of a historically disadvantaged part of the country.
Building Management and Worries
The building of both rail lines was managed by the nation's military, marking a significant expansion of its duties in national projects. They were built at an rapid pace, beating forecasts to be at least partly opened before the end of that administration.
However, this fast-paced schedule had concurrently raised significant apprehensions over safety standards.
- Sunday's derailment was the third occurrence on the Interoceanic Train this year.
- This includes an earlier collision this month when a train smashed into a truck at a level crossing.
- The other major rail project has also experienced several non-fatal derailments.
Calls for Investigation and Halt
In the aftermath of the disaster, the head of a major opposition party demanded an prompt pause in the development and management of all such projects.
This stoppage was proposed pending a comprehensive technical review. The party emphasized that the situation "calls for prompt explanations."
In reply, the president insisted that the train had been functioning in complete accordance with all safety requirements. Assurances were given that the government would remain "responsible" in both the construction and running of these strategic undertakings.